Rate Case Procedures for Water and Wastewater Utilities
This brochure is designed to explain the rate case procedures for a water and/or
wastewater utility regulated by the Florida Public Service Commission (PSC). Inside
is a listing of the various types of rate case proceedings and the steps involved.
The PSC and its staff are always ready to answer questions about the regulation
of public utilities. The Commission's Division of Regulatory Compliance and Consumer
Assistance is standing by to assist the customers of regulated utilities. Consumers
should initially, however, seek information on rules, service and rates directly
from the utility.
- Standard Rate Case
-
This procedure is used for larger water/wastewater utilities, or any utility seeking
a substantial increase in rates and charges. The case begins when the utility requests
a specific period of time (a “test year”) to be used to determine the proper investment
and expenses on which rates should be based. It usually takes 90 to 120 days from
the test year approval for the utility to prepare the rate, accounting, and engineering
data that are necessary to support a requested increase. These data are required
by Florida Public Service Commission (PSC) rules and are called minimum filing requirements
(MFRs).
When the MFRs are filed with and accepted by the PSC, a statutory timeclock begins.
The PSC has 60 days during which it may officially suspend, deny or approve the
utility’s requested rates. Generally, the requested rates are suspended because
further investigation is needed. During the first 60 days, the statute permits the
PSC to authorize an interim rate increase, subject to refund, to go into effect
while the case is pending, if the MFRs indicate that the utility is earning less
than its last authorized rate of return on investment.
The utility is required to place a copy of the MFRs and a summary of the rate request
at its business office in the service area. Copies are also placed in the county
library or local community center. Within 30 days after the time schedule for the
case is established by the PSC, the utility must begin notifying the customers that
a rate increase is being requested, and list the present and utility proposed rates,
the time schedule for the case, and the location of the summary and the MFRs.
The PSC has a professional staff that specializes in reviewing and analyzing the
data submitted by the utility in support of its rate request. An audit of the utility’s
accounting and billing records is made and the company’s financial operations carefully
reviewed. Engineering personnel make a detailed study of the utility’s physical
facilities with onsite investigations of the plant. The staff engineer also reviews
the utility’s compliance with local, state and federal environmental agency rules.
A panel of two or more Public Service Commissioners will be assigned to hear the
case and make a final decision. One of the Commissioners will be designated as the
Prehearing Officer to handle procedural matters. The Prehearing Officer will issue
a procedural order that will outline dates for filing testimony, holding a prehearing
conference in Tallahassee, and conducting a formal hearing, which is usually held
in or close to the service area of the utility. Parties begin to develop the issues
at the preliminary prehearing conference, and the formal evidentiary hearing is
usually held approximately five months into the rate case.
The Office of Public Counsel is authorized by statute to represent consumers in
cases before the PSC, and consumer input is an integral part of the hearing and
the final decision. The quality of service to the consumer, responsiveness of the
management to the consumer, and the history of the utility’s operation and rate
structure are all areas in which consumer input is helpful to the PSC's final determination
of a fair and reasonable level of water and wastewater rates.
The morning session of the first day of the hearing is often reserved for customer
testimony. Usually an evening session is also held to accommodate customers who
work during the daytime. Everything that takes place at the formal hearing is reported
by a court reporter, and a transcript is prepared after the hearing. Each of the
parties prepares a brief, and the staff of the Commission prepares a recommendation
based on the evidence presented at the hearing. The panel of Commissioners hearing
the case will vote on each of the issues at a regularly scheduled agenda conference
in Tallahassee. A final order is prepared based on the Commissioners' vote.
The entire process for this type of case usually takes eight months to complete.
The PSC’s final decision in a case can be appealed to the First District Court of
Appeal and ultimately to the Florida Supreme Court.
- Proposed Agency Action Process
-
Some of the larger utilities, instead of going directly to hearing, choose to file
a rate case under the PSC's proposed agency action (PAA) process, in which the case
will not be set for a formal hearing. In the first few months of the case, as a
part of the discovery process, the PSC staff schedules a customer meeting in the
utility’s service area to hear customer comments on quality of service, rate structure
and other opinions on the rate case. The suspension of the proposed rates and the
determination of interim rates are still the same as in a standard rate case.
After the staff investigations have been completed, and after the customer meeting,
the staff prepares a recommendation to be considered by the full Commission at a
regularly scheduled agenda conference in Tallahassee. Since the case has not been
to hearing at this point, affected parties are allowed to address the Commission
at the conference when the case is being considered. The Commission votes to adopt,
reject, or modify the staff’s recommendation. A proposed agency action order is
prepared and issued. The order becomes final if a substantially affected person
does not protest it within a twenty-one day protest period.
This process usually takes five months. If the case is protested, it will be scheduled
for a hearing, and a final decision will be made within eight months of the date
of the protest.
- Staff Assisted Rate Case
-
Many of the water and wastewater utilities located throughout the state are very
small and do not have the staff to compile the financial and engineering data that
make up the MFRs for a rate case. Because of their size, it is also not economically
feasible for them to hire outside engineers, accountants and attorneys to compile
the necessary information without great expense, which may be passed on to consumers.
For this reason, the PSC developed a “staff-assisted” rate case (SARC) program in
which small utilities with annual water or wastewater revenues under $150,000 can
request that the PSC staff develop the information for the rate case. The primary
purpose of this type of program is to avoid passing on to the customer, through
higher rates, the substantial cost of having outside consultants develop the rate
case data. In a staff-assisted rate case, the PSC staff audits the utility’s books
and carefully reviews expenditures and operations. Engineers and accountants make
onsite investigations of the company’s operations. A customer meeting is held in
the service area to allow the customers to offer testimony on quality of service
and comment on the rates under consideration. After considering the testimony of
the customers and the findings of the investigations and audit, a staff recommendation
is prepared and scheduled for a regular PSC agenda conference.
Since the case has not been to hearing at this point, affected parties are allowed
to address the Commission at the conference when the case is being considered. The
Commission votes to adopt, reject, or modify the staff's recommendation. A proposed
agency action order is prepared and issued. The order becomes final if a substantially
affected person, other than the utility, does not protest it within a twenty-one
day protest period. If the case is protested, it will be scheduled for hearing.
The Commission will usually authorize the rates proposed in the PAA order to go
into effect as temporary rates subject to refund, until the case is concluded. The
Commission has 15 months from the official filing date in which to issue its order.
- Price Index and Pass Through Rate Adjustments
-
The Florida Statutes require the PSC to issue an index for major categories of operating
costs each year and to allow the water and wastewater utilities to adjust their
rates based on the index in an attempt to partially cover increases or decreases
in those costs. Price index rate adjustments have resulted in rate increases from
1 percent to 5 percent over the last few years.
The Florida Statutes also allow water and wastewater utilities to automatically
“pass through” any cost increases or decreases for water that is purchased from
another utility, for wastewater disposal purchased from another utility, for electric
power and ad valorem taxes, and for water and wastewater testing required by the
Florida Department of Environmental Protection. The Florida Statutes prohibit a
utility from adjusting its rates by indexing or passthrough more than two times
in any 12 month period.
- How To Contact the Public Service Commission and Its Staff:
-
If you have a problem regarding your service, billing or rates, first attempt to
resolve it with the utility. After giving the utility adequate time to correct the
problem, if you still are not satisfied, call the PSC's Division of Regulatory Compliance
and Consumer Assistance at 1-800-342-3552, or fax your questions to 1-800-511-0809.
You may also contact the PSC via the following e-mail address:
contact@psc.state.fl.us
Or write to the:
Florida Public Service Commission,
Division of Regulatory Compliance and Consumer Assistance
2540 Shumard Oak Boulevard,
Tallahassee, FL 32399-0850.
|